Cement bags, steel in tonnes, blocks, sand and aggregate for a whole house from its built-up area, or for one wall, slab, beam, column or footing. Check a contractor’s estimate in a minute.
A normal RCC home in Kerala with block walls uses about 0.4 bags of cement per sq ft of built-up area, roughly 400 bags for 1,000 sq ft, and about 3.5 kg of steel per sq ft for a single floor, 4 kg for G + 1 and 4.5 kg for G + 2. The structural design gives the exact quantities.
Rules and rates last updated 17 November 2026 · Checked by the Build 1 engineering team
A whole house, or one part of it.
About 186 sq m of built-up area.
Reviewed on 17 November 2026. Every factor is in the table further down.
Last updated 17 November 2026. Standard thumb rules for RCC homes in Kerala; your structural engineer’s design replaces them.
Click a number in the editor to change it, then press Save.
17 November 2026
5 %
3 %
Thumb rules for a normal RCC framed home.
0.4 bags
1.8 cft
40 %
1.35 cft
3.5 kg
4 kg
4.5 kg
1.0 pieces
8 pieces
0.6 pieces
Nominal mixes: cement, sand, aggregate.
1, 2, 4
1, 1.5, 3
1, 1, 2
1.54
1440 kg per cubic metre
80 kg per cubic metre
130 kg per cubic metre
160 kg per cubic metre
80 kg per cubic metre
Block work and cement plaster.
10 mm
1.33
12 mm
4
To change a number: open the site editor, click the number, type the new value and press Save. Material prices come from the shared rate table on the materials and brands page.
A quantity check only works if you can see what the estimate is based on.
Footing, column, beam and slab sizes decide the steel and concrete.
Lists every bar by diameter and length, so steel can be weighed on site.
Ask whether slabs are M20 or M25, site-mixed or ready-mix.
Blocks, bricks or AAC change the mortar, plaster and labour.
About 400 bags, using the thumb rule of 0.4 bags a sq ft of built-up area for a normal RCC home with block walls and plaster. The structural design gives the exact number.
About 3.5 kg a sq ft for a single floor, 4 kg for G + 1 and 4.5 kg for G + 2. Long spans, cantilevers and poor soil need more.
About 1.8 cft of sand and 1.35 cft of 20 mm aggregate for every sq ft of built-up area, split between M-sand for concrete and masonry and P-sand for plaster.
Put in the same built-up area and floors. Cement and steel should be within about 10% of these figures for a normal home. If they are much higher, ask for the structural drawings and the bar bending schedule.
From its size: concrete is converted to dry volume (× 1.54) and split by the mix ratio; walls count blocks with 10 mm joints and work out mortar and plaster from what is left. A 5% margin covers wastage.
Yes. The cost uses the dated dealer rates in the materials and brands directory, for materials only.
Every good project starts with a clear conversation. Share your plot, approximate area, requirements and budget range, and we’ll suggest the right route and package.
Anywhere in Thrissur and Ernakulam districts.
Itemised, within 7 days of the site visit.
Walk a Build 1 site with our engineer.