Terrace, bathroom, water tank, basement or outer wall: tell us what you see and how old the building is. Get the system that fits, how it is done and a price range.
Kerala terraces leak through heat cracks, blocked drains, poor slope and worn coatings; a crack-bridging membrane or PU system with the drains and slope fixed lasts far longer than a coat of paint. Bathrooms need a two-component cementitious coating under the tiles and a 48-hour pond test.
Advice and rates last updated 17 November 2026 · Checked by the Build 1 engineering team
Each area faces water differently, so each needs a different system.
Cracks from heat, blocked drains, poor slope and old coatings let water in. A system that bridges cracks, with the drains and slope fixed, stops it. On old terraces a membrane or PU system lasts much longer than a coat of paint.
A 2-component cementitious coating on the floor, sunken slab and the lower walls, under the tiles, with a 48-hour pond test before tiling.
A cement-based treatment whose chemicals react with water in the concrete to form crystals that block the pores. It suits basements, sumps and tanks where water pushes from outside.
Between December and April, when surfaces are dry. Coatings and membranes do not bond well to wet concrete.
Acrylic coats about 3 to 5 years, cementitious 5 to 8, bituminous membranes 8 to 12 and PU 10 years or more, with care.
Every good project starts with a clear conversation. Share your plot, approximate area, requirements and budget range, and we’ll suggest the right route and package.
Anywhere in Thrissur and Ernakulam districts.
Itemised, within 7 days of the site visit.
Walk a Build 1 site with our engineer.