
Tell us where and what you are building. Get your permit route, the documents to collect, the clearances your plot needs, the fees and how long it takes. Kerala in detail, plus Tamil Nadu, Karnataka and Maharashtra.
Every new house in Kerala needs a permit from its grama panchayat, municipality or corporation under the Kerala Building Rules 2019. Houses up to 300 sq m and two floors can use the self-certified route, where the acknowledgement issued within 5 days is the permit; a regular permit usually takes 30 to 60 days.
All four states now have a quicker route for small homes, where a licensed professional certifies the plans. Larger buildings and plots that need clearances still go through scrutiny.
Every Kerala local body now runs on K-SMART, so permits, completion and building numbers are all online.
Land type at the village office and in the paddy data bank, the survey sketch and the access road. Paddy or nilam land needs Form 5 or Form 6 first.
Your licensee applies on K-SMART. Self-certified homes get the acknowledgement in 5 days; others take about 30 to 60 days.
Low-risk homes get a plinth-level inspection. If the plan changes, file a revised application before completion.
Submit the completion certificate. Occupancy is due in 15 days or deemed issued, then the building is numbered and taxed.
Yes. Every new house needs a permit from the grama panchayat, municipality or corporation under the Kerala Panchayat or Municipality Building Rules 2019. Houses up to 300 sq m and two floors can use the self-certified route: you and an empanelled engineer certify the plans, and the acknowledgement issued within 5 days is your permit.
A self-certified permit takes about 5 days after you submit. A regular permit usually takes 30 to 60 days, plus the time for any clearance such as railway, airport, coastal or paddy land. Drawings and documents usually take 2 to 4 weeks before that.
Houses up to 80 sq m pay no permit fee. From 81 to 150 sq m the fee is ₹25, ₹35 or ₹40 per sq m (panchayat, municipality, corporation), and from 151 to 300 sq m it is ₹50, ₹60 or ₹70 per sq m, charged on the whole area. Add an application fee of a few hundred rupees. These are the rates from August 2024.
Yes. Your engineer applies online on K-SMART. Sign a specific power of attorney before the Indian consulate or a notary with an apostille, and have it stamped in India within three months of it arriving. Your representative can then sign forms and attend inspections.
If the plot is in the paddy data bank, apply in Form 5 to the RDO to remove it. If it is nilam in the revenue records but not in the data bank, apply in Form 6 to change its nature. The conversion fee is 10% of fair value, and holdings up to 25 cents are exempt. Do this before you buy or design.
After construction, your engineer submits the completion certificate and plan. The occupancy certificate is due within 15 days, and is deemed issued if the local body does not act. The building is then numbered and assessed for property tax, which runs from the occupancy certificate.
In Kerala, a compound wall along a public road needs permission from the local body, at ₹3 per metre (₹4 in corporations). A wall between two private plots does not, as long as its gate does not open to the road. Apply with the house permit to save time.
Yes. Tamil Nadu gives instant self-certified permits for small homes on the single window portal. Bengaluru approves small homes online under Nambike Nakshe and needs an e-Khata. Maharashtra needs no separate permission on plots up to 150 sq m and gives permission on submission up to 300 sq m.
Every good project starts with a clear conversation. Share your plot, approximate area, requirements and budget range, and we’ll suggest the right route and package.
Anywhere in Thrissur and Ernakulam districts.
Itemised, within 7 days of the site visit.
Walk a Build 1 site with our engineer.